BetterScapes Logo
Seasonal Tips

Spring Lawn Care Checklist for Lehigh Valley Properties

BetterScapes Lawn Team·March 1, 2026·5 min read
Spring Lawn Care Checklist for Lehigh Valley Properties

March: Don't Rush It

The urge to get out and do something to your lawn in March is understandable — but most March lawn work does more harm than good. Lehigh Valley soils are typically saturated and frost-susceptible through most of March. Walking on frozen or saturated turf compacts the soil and damages grass crowns.

March tasks that are actually useful:

  • Clean up any remaining leaf debris
  • Sharpen mower blades
  • Service lawn equipment before the season starts
  • Scout for winter damage and dead patches

April: The Action Month

April is the highest-value month in the spring lawn calendar.

Early April

  • Crabgrass pre-emergent application — watch soil temps, target 50–53°F for application timing
  • First mow when turf reaches 4 inches — set mower to 3.5 inches (never remove more than 1/3 of blade height)
  • Assess bare areas that need overseeding attention in fall

Late April

  • Broadleaf weed post-emergent for dandelions, clover, and other established weeds
  • Lime application if soil pH testing shows acidic conditions (below 6.0 for most cool-season grasses)

May: Build the Foundation

  • Fertilization Round 1 — slow-release nitrogen to build density without forcing excessive growth
  • Increase mowing frequency to weekly as growth accelerates
  • Begin monitoring for dollar spot and brown patch risk in low-lying areas
  • Do NOT aerate or overseed in spring — you'll compete with crabgrass pre-emergent and stress the turf heading into summer heat

A Note on Cool-Season Grasses

Lehigh Valley lawns are almost universally cool-season grass mixtures — tall fescue, Kentucky bluegrass, and perennial ryegrass. These grasses have two active growth windows: spring (April–June) and fall (August–October). Summer is a stress period, not a growth period. Plan your major renovation work — aeration, overseeding, renovation — for late August through September.

Call Now — 24/7 Service